Photos of the construction site illustrates that the Chattahoochee River’s facelift is of epic proportions. Images of the flickr set provide a glimpse of the work that has established a channel right of center and the platform for adjustable elements. The design flexibility will allow the City to adjust or tune the Georgia / river …
On December 13th and 14th a crew of talented, earnest and enthusiastic paddlers convened to participate in an evaluation of the site that is outfitted with a tunable WaveShaper. Clay Wright, Pat Keller, Andrew Holcomb and Daniel Dutton were recruited to join the event, and we were also lucky to have Tommy Yon and Zach …
MWDG has designed an improved configuration for the Hartland Dam in Delta, Colorado. The modification objective is to: Provide upstream passage for three native fishes, roundtail chub, bluehead sucker, and flannelmouth sucker, and to reestablish population connectivity for these fishes upstream and downstream of the dam. Improve safety of boat passage over the existing dam. …