Photos of the construction site illustrates that the Chattahoochee River’s facelift is of epic proportions. Images of the flickr set provide a glimpse of the work that has established a channel right of center and the platform for adjustable elements. The design flexibility will allow the City to adjust or tune the Georgia / river left side once the dams are removed and beyond, years from now.