As the WaveShaper foundation finalization and installation finishes, the dam demolition has continued so that in a few days, water will descend over the Georgia side of the Lower Chattahoochee and the world will see the result of years of calculating, drawing, modeling, blasting, and drilling. This link takes you to the continuation of the …
Enhancement of the river right, or Alabama side of the Lower Chattahoochee has exceeded even our expectations! The channel we had to work with was blasted into a hardly natural straight-sided canal which, when loaded once or twice daily with 5,000 – 12,000+ cfs created a gargantuan explosion before churning out into the open width …