Enhancement of the river right, or Alabama side of the Lower Chattahoochee has exceeded even our expectations! The channel we had to work with was blasted into a hardly natural straight-sided canal which, when loaded once or twice daily with 5,000 – 12,000+ cfs created a gargantuan explosion before churning out into the open width …
On October 31 Rick, Jack, and Risa visited the Columbus site where work on the Alabama side of the Lower Chattahoochee includes both blasting and building. The power of the water in this river is amazing, and challenging for both the design and project construction. The water does not flow like it would in a …